Waterway information



Kind:
Inland
Driving areas:
🇳🇱 Netherlands
Length:
39 km¹
¹River kilometers or bank length recorded in NavShip, including river arms and harbor entrances.
Availability:
Completely recorded
Recent Update: 08.04.2025²
² This date indicates when an adjustment last took place in the course of the body of water
Recorded:
Locks: 1
Harbours / marinas: 2
Bridges: 14
Berths: 0
Slipways: 1
Fuelstations: 0
Route:
Please wait, loading route graphic...
Request waterway overview map with symbol legend here (Link).
Information about data associated with this body of water (18 available):
Data by OpenSeaMap (c) OSM contributors, www.openseamap.org
# | Kind | Coordinates | Name | Information |
---|---|---|---|---|
1 | Marina | 52.16669,5.37444 | Jachthaven WSV DE Eemkruisers | https://www.eemkruisers.nl |
2 | Marina | 52.16541,5.37797 | Jachthaven de Stuw | https://jachthavendestuw.nl/ |
3 | Bridge | 52.18268,5.33606 | Malebrug | Clearance height: 3 m Maximum passage width: 8 m Rigid, immovable bridge construction |
4 | Bridge | 52.15935,5.38462 | Smallebrug | Clearance height: 2.5 m Maximum passage width: 18 m Rigid, immovable bridge construction |
5 | Bridge | 52.15949,5.38439 | Spoorbrug Amersfoort | Clearance height: 2.5 m Maximum passage width: 18 m Rigid, immovable bridge construction |
6 | Bridge | 52.16021,5.3832 | 't Sasje | Clearance height: 2.4 m Maximum passage width: 7 m Movable bridge (e.g. lifting bridge or drawbridge) |
7 | Bridge | 52.16208,5.3788 | Kwekersbrug | Clearance height: 2 m Maximum passage width: 9 m Movable bridge (e.g. lifting bridge or drawbridge) |
8 | Bridge | 52.16586,5.37454 | Koppelbrug | Clearance height: 2.8 m Maximum passage width: 9.5 m Movable bridge (e.g. lifting bridge or drawbridge) |
9 | Bridge | 52.17159,5.36175 | Drie-Sluizenbrug | Clearance height: 7.4 m Maximum passage width: 35 m Rigid, immovable bridge construction |
10 | Bridge | 52.1828,5.33614 | Malebrug | Clearance height: 3.2 m Maximum passage width: 12 m Movable bridge (e.g. lifting bridge or drawbridge) |
11 | Bridge | 52.21889,5.30677 | Baarn, brug in de A-1 | Clearance height: 7.9 m Maximum passage width: 21.5 m Rigid, immovable bridge construction |
12 | Bridge | 52.22556,5.3133 | Eembrug | Clearance height: 1.9 m Maximum passage width: 9.1 m Movable bridge (e.g. lifting bridge or drawbridge) |
13 | Bridge | 52.22566,5.3131 | Rijwielpadbrug | Clearance height: 1.9 m Maximum passage width: 9.1 m Movable bridge (e.g. lifting bridge or drawbridge) |
14 | Bridge | 52.15846,5.38588 | Kleine Spui brug | Clearance height: 3 m Maximum passage width: 4 m Rigid, immovable bridge construction |
15 | Bridge | 52.15806,5.38633 | 't Zandbrug | Clearance height: 1.5 m Maximum passage width: 5 m Rigid, immovable bridge construction |
16 | Bridge | 52.18291,5.33622 | Malebrug | Clearance height: 3 m Maximum passage width: 8 m Rigid, immovable bridge construction |
17 | Slipway | 52.16713,5.37488 | Unknown | small_craft_facility |
18 | Lock | 52.15837,5.386 | Unknown |