
Kind:
Inland
Driving areas:
🇩🇪 Germany
Length:
10.8 km¹, 11 km official total length
¹River kilometers or bank length recorded in NavShip, including river arms and harbor entrances.
Availability:
Completely recorded
Recent Update: 07.04.2025²
² This date indicates when an adjustment last took place in the course of the body of water
Recorded:
Locks: 0
Harbours / marinas: 3
Bridges: 38
Berths: 0
Slipways: 0
Fuelstations: 0
Useful information:
The Landwehr Canal is a federal waterway in Berlin. As a side canal of the Berlin Spree, it connects the Spree at Osthafen with the Spree at Spreekreuz in Charlottenburg. It passes through the districts of Kreuzberg, Neukölln, Tiergarten, and Charlottenburg.
Since 2013, the Landwehr Canal can only be navigated downhill from the upper to the lower lock. A maximum speed of 6 km/h must be observed. The canal is mostly used by excursion boats and sports boats.
Route:
Request waterway overview map with symbol legend here (Link).
Information about data associated with this body of water (41 available):
Data by OpenSeaMap (c) OSM contributors, www.openseamap.org
# | Kind | Coordinates | Name | Information |
---|---|---|---|---|
1 | Marina | 52.4958,13.4071 | Anleger am Schiffsrestaurant van Loon | [email protected] +49 30 6926293 https://vanloon.de/ |
2 | Marina | 52.49578,13.41102 | Liegestelle Sport 24h | |
3 | Marina | 52.49177,13.44111 | Liegestelle Sport 24h | |
4 | Bridge | 52.51947,13.31932 | Dovebrücke | Clearance height: 4.42 m Maximum passage width: 15.5 m Rigid, immovable bridge construction |
5 | Bridge | 52.51725,13.32477 | Marchbrücke | Clearance height: 4.4 m Maximum passage width: 15.5 m Rigid, immovable bridge construction |
6 | Bridge | 52.51318,13.33094 | Charlottenburger Brücke | Clearance height: 3.56 m Maximum passage width: 21.03 m Rigid, immovable bridge construction |
7 | Bridge | 52.51184,13.33407 | Fußgängerbrücke Vorhafen | Clearance height: 3.88 m Maximum passage width: 15.5 m Rigid, immovable bridge construction |
8 | Bridge | 52.51165,13.33519 | Eisenbahnbrücke Unterschleuse | Clearance height: 6.96 m Maximum passage width: 8.47 m Rigid, immovable bridge construction |
9 | Bridge | 52.5114,13.33631 | Südliche Fußgängerbrücke Unterschleuse | Clearance height: 4.21 m Maximum passage width: 8.47 m Rigid, immovable bridge construction |
10 | Bridge | 52.50906,13.3433 | Lichtensteinbrücke | Clearance height: 4.74 m Maximum passage width: 14 m Rigid, immovable bridge construction |
11 | Bridge | 52.50727,13.34811 | Corneliusbrücke | Clearance height: 3.91 m Maximum passage width: 14 m Rigid, immovable bridge construction |
12 | Bridge | 52.50574,13.3523 | Herkulesbrücke | Clearance height: 3.53 m Rigid, immovable bridge construction |
13 | Bridge | 52.50581,13.35187 | Herkulesbrücke | Clearance height: 3.53 m Rigid, immovable bridge construction |
14 | Bridge | 52.50667,13.35741 | Hiroshimasteg | Clearance height: 3.6 m Rigid, immovable bridge construction |
15 | Bridge | 52.5057,13.36253 | Bendlerbrücke | Clearance height: 3.79 m Maximum passage width: 14 m Rigid, immovable bridge construction |
16 | Bridge | 52.50601,13.36836 | Potsdamer Brücke | Clearance height: 5 m Maximum passage width: 14 m Rigid, immovable bridge construction |
17 | Bridge | 52.50496,13.37181 | George C. Marshall Brücke | Clearance height: 4.35 m Maximum passage width: 17.71 m Rigid, immovable bridge construction |
18 | Bridge | 52.50288,13.37459 | Hochbahnbrücke U2 | Clearance height: 7.97 m Maximum passage width: 13 m Rigid, immovable bridge construction |
19 | Bridge | 52.50273,13.37487 | Köthener Brücke | Clearance height: 3.47 m Maximum passage width: 13 m Rigid, immovable bridge construction |
20 | Bridge | 52.50176,13.3765 | Schöneberger Brücke | Clearance height: 3.68 m Maximum passage width: 14 m Rigid, immovable bridge construction |
21 | Bridge | 52.49939,13.37875 | Hochbahnbrücke U1, U15 | Clearance height: 11.43 m Maximum passage width: 13 m Rigid, immovable bridge construction |
22 | Bridge | 52.49924,13.37912 | Anhalter Steg | Clearance height: 6.91 m Rigid, immovable bridge construction |
23 | Bridge | 52.49899,13.38032 | Möckernstraße | Clearance height: 3.5 m Rigid, immovable bridge construction |
24 | Bridge | 52.49895,13.38302 | Hochbahnübergang | Clearance height: 3.72 m Maximum passage width: 14 m Rigid, immovable bridge construction |
25 | Bridge | 52.49871,13.38524 | Großbeerenbrücke | Clearance height: 3.49 m Maximum passage width: 7 m Rigid, immovable bridge construction |
26 | Bridge | 52.49782,13.38903 | Mehringbrücke | Clearance height: 3.73 m Maximum passage width: 14 m Rigid, immovable bridge construction |
27 | Bridge | 52.49764,13.39201 | Hallesche-Tor-Brücke | Clearance height: 4.05 m Maximum passage width: 13 m Rigid, immovable bridge construction |
28 | Bridge | 52.49787,13.39575 | Zossener Brücke | Clearance height: 3.59 m Maximum passage width: 14 m Rigid, immovable bridge construction |
29 | Bridge | 52.49732,13.39882 | Waterloobrücke | Clearance height: 3.78 m Maximum passage width: 14 m Rigid, immovable bridge construction |
30 | Bridge | 52.49653,13.40519 | Baerwaldbrücke | Clearance height: 4.16 m Maximum passage width: 13 m Rigid, immovable bridge construction |
31 | Bridge | 52.49531,13.41565 | Rohrbrücke | Clearance height: 4.73 m Maximum passage width: 14 m Rigid, immovable bridge construction |
32 | Bridge | 52.49525,13.41514 | Admiralbrücke | Clearance height: 4.35 m Rigid, immovable bridge construction |
33 | Bridge | 52.49602,13.42005 | Kottbusser Brücke | Clearance height: 4.05 m Rigid, immovable bridge construction |
34 | Bridge | 52.49366,13.42843 | Hobrechtbrücke | Clearance height: 4.21 m Maximum passage width: 14 m Rigid, immovable bridge construction |
35 | Bridge | 52.49141,13.43539 | Thielenbrücke | Clearance height: 3.74 m Maximum passage width: 13 m Rigid, immovable bridge construction |
36 | Bridge | 52.49082,13.43728 | Rohrbrücke | Clearance height: 4.21 m Maximum passage width: 14 m Rigid, immovable bridge construction |
37 | Bridge | 52.49417,13.44446 | Görlitzer Brücke | Clearance height: 4.92 m Maximum passage width: 14 m Rigid, immovable bridge construction |
38 | Bridge | 52.49539,13.44606 | Ernst-Heilmann-Steg | Clearance height: 4.57 m Maximum passage width: 14 m Rigid, immovable bridge construction |
39 | Bridge | 52.49484,13.44691 | Treptower Brücke | Clearance height: 1.5 m Rigid, immovable bridge construction File:Treptower_Brücke_1_Lohmühleninsel_Berlin.JPG |
40 | Bridge | 52.49745,13.44857 | Schlesische Brücke | Clearance height: 3.50 m Rigid, immovable bridge construction |
41 | Bridge | 52.49738,13.44869 | Schlesische Brücke | Clearance height: 3.50 m Rigid, immovable bridge construction |