
Kind:
Inland
Driving areas:
🇺🇸 United States of America
Length:
1688.1 km¹, 4087 km official total length
¹River kilometers or bank length recorded in NavShip, including river arms and harbor entrances.
Availability:
Completely recorded
Recent Update: 09.04.2025²
² This date indicates when an adjustment last took place in the course of the body of water
Recorded:
Locks: 0
Harbours / marinas: 16
Bridges: 18
Berths: 4
Slipways: 2
Fuelstations: 1
Useful information:
The Missouri River, also known as the "Big Muddy" because of its high mud content, is the longest tributary of the Mississippi River at over 4000 kilometers and the longest river in the USA, as it is longer than the river into which it flows.
Together with this stream, the Missouri forms the Missouri-Mississippi, the longest river system in North America and the fourth longest on earth.
Its catchment area covers around one sixth of the entire surface area of the USA. Together with the Mississippi, the river forms the fourth longest river system in the world.
Route:
Request waterway overview map with symbol legend here (Link).
Information about data associated with this body of water (41 available):
Data by OpenSeaMap (c) OSM contributors, www.openseamap.org
# | Kind | Coordinates | Name | Information |
---|---|---|---|---|
1 | Marina | 46.78815,-100.81618 | 2020-10-31T18:34:18Z | |
2 | Marina | 42.86917,-97.60406 | 2024-09-10T20:18:44Z | |
3 | Marina | 38.81578,-92.38329 | 2025-04-08T14:31:29Z | Cooper's Landing Marina |
4 | Marina | 41.13054,-95.87663 | 2023-06-08T21:36:33Z | Haworth Park Marina |
5 | Marina | 41.25148,-95.91638 | 2022-04-05T20:53:49Z | Bijoux Terner |
6 | Marina | 41.26373,-95.92388 | 2022-04-17T18:40:34Z | Riverfront Marina |
7 | Marina | 41.35161,-95.95929 | 2025-04-12T14:10:27Z | Corps of Engineers Basin |
8 | Marina | 41.3602,-95.9475 | 2022-10-18T10:27:58Z | Dodge Park Marina |
9 | Marina | 41.58594,-96.09188 | 2022-07-31T23:21:40Z | River View Park Marina |
10 | Marina | 41.58808,-96.09488 | 2022-07-31T23:35:35Z | Cottonwood Cove Marina |
11 | Marina | 42.01079,-96.24222 | 2024-08-09T06:50:05Z | Decatur Marina |
12 | Marina | 42.4901,-96.41905 | 2022-03-30T23:39:50Z | Sioux City Marina |
13 | Marina | 46.63542,-111.72131 | 2020-10-04T17:04:44Z | Yacht Basin Marina |
14 | Marina | 46.65087,-111.70177 | 2020-10-05T16:50:58Z | Kim's Marina |
15 | Marina | 46.54012,-111.56105 | 2020-09-15T22:39:40Z | Goose Bay Marina |
16 | Marina | 47.99445,-106.48722 | 2022-07-15T00:24:19Z | Fort Peck Marina |
17 | Bridge | 39.21472,-93.51182 | Unknown | Clearance height: 2023-07-12T03:03:31Z m Maximum passage width: 22.2 m Movable bridge (e.g. lifting bridge or drawbridge) fixed |
18 | Bridge | 39.21608,-93.51204 | Unknown | Clearance height: 2023-07-11T19:50:32Z m Maximum passage width: 17.5 m Movable bridge (e.g. lifting bridge or drawbridge) fixed |
19 | Bridge | 39.21026,-93.86369 | Unknown | Clearance height: 2023-07-12T07:13:52Z m Maximum passage width: 14.8 m Movable bridge (e.g. lifting bridge or drawbridge) fixed |
20 | Bridge | 39.17874,-94.18002 | Unknown | Clearance height: 2023-07-14T17:33:46Z m Maximum passage width: 26.9 m Movable bridge (e.g. lifting bridge or drawbridge) fixed |
21 | Bridge | 39.1684,-94.39497 | 124.0 | Clearance height: 2023-07-14T17:40:51Z m Maximum passage width: 21.5 m Movable bridge (e.g. lifting bridge or drawbridge) fixed |
22 | Bridge | 39.14504,-94.48408 | 122.8 | Clearance height: 2023-07-14T17:49:31Z m Maximum passage width: 15.6 m Movable bridge (e.g. lifting bridge or drawbridge) lifting |
23 | Bridge | 39.15186,-94.4982 | 121.9 | Clearance height: 2023-07-14T17:56:54Z m Maximum passage width: 22.7 m Movable bridge (e.g. lifting bridge or drawbridge) fixed |
24 | Bridge | 39.15088,-94.49824 | 91.4 | Clearance height: 2023-07-14T17:56:54Z m Maximum passage width: 22.4 m Movable bridge (e.g. lifting bridge or drawbridge) fixed |
25 | Bridge | 39.14643,-94.53431 | 129.1 | Clearance height: 2023-07-14T17:59:26Z m Maximum passage width: 16.1 m Movable bridge (e.g. lifting bridge or drawbridge) fixed |
26 | Bridge | 39.12218,-94.56531 | 138.3 | Clearance height: 2023-08-03T15:49:25Z m Maximum passage width: 24.2 m Movable bridge (e.g. lifting bridge or drawbridge) fixed |
27 | Bridge | 39.11628,-94.57875 | 106.6 | Clearance height: 2023-07-14T18:14:59Z m Maximum passage width: 15.8 m Movable bridge (e.g. lifting bridge or drawbridge) fixed |
28 | Bridge | 39.11592,-94.5796 | 106.6 | Clearance height: 2023-07-14T18:14:59Z m Maximum passage width: 15.1 m Movable bridge (e.g. lifting bridge or drawbridge) lifting |
29 | Bridge | 39.11263,-94.58867 | 60.9 | Clearance height: 2023-07-14T18:39:13Z m Maximum passage width: 17.0 m Movable bridge (e.g. lifting bridge or drawbridge) swing |
30 | Bridge | 39.11206,-94.58827 | 60.9 | Clearance height: 2023-07-14T18:39:13Z m Maximum passage width: 17.0 m Movable bridge (e.g. lifting bridge or drawbridge) swing |
31 | Bridge | 39.15374,-94.65096 | 125.5 | Clearance height: 2023-08-03T02:19:09Z m Maximum passage width: 22.5 m Movable bridge (e.g. lifting bridge or drawbridge) fixed |
32 | Bridge | 39.19183,-94.76979 | 126.4 | Clearance height: 2023-08-03T02:23:00Z m Maximum passage width: 25.7 m Movable bridge (e.g. lifting bridge or drawbridge) fixed |
33 | Bridge | 39.32988,-94.90772 | 121.9 | Clearance height: 2023-08-03T02:30:17Z m Maximum passage width: 21.7 m Movable bridge (e.g. lifting bridge or drawbridge) fixed |
34 | Bridge | 39.32966,-94.90911 | 121.9 | Clearance height: 2023-08-03T02:30:17Z m Maximum passage width: 21.7 m Movable bridge (e.g. lifting bridge or drawbridge) fixed |
35 | Slipway | 38.67148,-91.55237 | Unknown | 2025-04-20T08:07:54Z |
36 | Slipway | 41.58542,-96.09161 | Unknown | 2022-07-31T23:18:38Z |
37 | Berth | 39.15134,-94.49381 | 2023-07-29T05:35:48Z | dry_cargo |
38 | Berth | 39.15238,-94.50438 | 2023-07-30T18:10:11Z | dry_cargo |
39 | Berth | 39.14995,-94.52433 | 2023-07-30T18:10:11Z | dry_cargo |
40 | Berth | 39.11123,-94.60539 | 2023-07-29T23:51:29Z | dry_cargo |
41 | Fuel station | 38.81595,-92.38322 | 2025-04-08T13:58:24Z | Cooper's Landing Fuel |