Waterway information



Kind:
Inland
Driving areas:
🇳🇱 Netherlands
Length:
11.1 km¹
¹River kilometers or bank length recorded in NavShip, including river arms and harbor entrances.
Availability:
Completely recorded
Recent Update: 06.06.2019²
² This date indicates when an adjustment last took place in the course of the body of water
Recorded:
Locks: 0
Harbours / marinas: 0
Bridges: 10
Berths: 0
Slipways: 0
Fuelstations: 0
Route:
Please wait, loading route graphic...
Request waterway overview map with symbol legend here (Link).
Information about data associated with this body of water (10 available):
Data by OpenSeaMap (c) OSM contributors, www.openseamap.org
# | Kind | Coordinates | Name | Information |
---|---|---|---|---|
1 | Bridge | 53.2702,6.158 | 8 | Clearance height: 2020-07-01T18:33:44Z m Maximum passage width: 2.9 m Movable bridge (e.g. lifting bridge or drawbridge) fixed |
2 | Bridge | 53.27204,6.14164 | 8 | Clearance height: 2013-02-28T10:36:49Z m Maximum passage width: 2.95 m Movable bridge (e.g. lifting bridge or drawbridge) fixed |
3 | Bridge | 53.27357,6.12801 | 8 | Clearance height: 2013-02-28T10:36:49Z m Maximum passage width: 2.85 m Movable bridge (e.g. lifting bridge or drawbridge) fixed |
4 | Bridge | 53.27364,6.12723 | Unknown | Clearance height: 2013-02-28T10:36:50Z m Maximum passage width: 2.85 m Movable bridge (e.g. lifting bridge or drawbridge) fixed |
5 | Bridge | 53.27652,6.10859 | 8 | Clearance height: 2013-02-28T10:36:50Z m Maximum passage width: 2.9 m Movable bridge (e.g. lifting bridge or drawbridge) fixed |
6 | Bridge | 53.28251,6.0888 | 8 | Clearance height: 2020-07-01T18:33:44Z m Maximum passage width: 2.9 m Movable bridge (e.g. lifting bridge or drawbridge) fixed |
7 | Bridge | 53.28709,6.07932 | 8 | Clearance height: 2013-02-28T10:36:51Z m Maximum passage width: 2.95 m Movable bridge (e.g. lifting bridge or drawbridge) fixed |
8 | Bridge | 53.32041,6.03625 | 8.9 | Clearance height: 2013-04-04T11:16:03Z m Maximum passage width: 3.1 m Movable bridge (e.g. lifting bridge or drawbridge) fixed |
9 | Bridge | 53.3142,6.04642 | 8 | Clearance height: 2013-04-04T11:16:03Z m Maximum passage width: 3 m Movable bridge (e.g. lifting bridge or drawbridge) fixed Dinzerbrug |
10 | Bridge | 53.29948,6.06808 | 8.4 | Clearance height: 2013-11-29T16:26:50Z m Maximum passage width: 3 m fixed Keatlingwier |